classification of ev Charger ​

2023-11-01



AC piles are distinguished by single/two/three-phase input power supply, and the corresponding charging pile input terminals need to be connected to single-phase, two-phase and three-phase AC power supplies respectively, and the number of output phases is the same as that of the input. The DC pile is generally powered by three-phase AC input.

In addition, there is a difference between private piles and operating piles. The former does not require charging and billing, while the latter requires charging and charging. Therefore, it is necessary to have a human-machine interface, a means of payment, and a connection with the operation/charging system.